COMPLETED - Network Maintenance (Saturday, January 23rd,2016 between 00:01 and 0:30 CST)

  • Friday, 22nd January, 2016
  • 18:15pm
The switch that provides service to our main server will be rebooted on Saturday, January 23rd, 2016 between 00:01 and 0:30 CST (06:01 - 06:30 GMT). This upgrade is to provide the switch with a necessary updated firmware revision, providing continuing performance and reliability to the server. In order to complete the upgrade the switch will need to be rebooted. The upgrade should take no longer than 10 to 15 minutes to complete.

We apologize in advance for any inconvenience this may cause.
<< Geri

Powered by WHMCompleteSolution